Manchester Facility Prepares Hydrogen Excavators for Deployment

Aug 5, 2024

Today marks another important step towards us deploying the modified excavators on construction sites in Q4 this year.

The project has reached an exciting stage with the installation of the hydrogen tanks and control systems to the two Caterpillar 320 excavators at our facility in Manchester. Previously, one of the Caterpillar 320 excavators was tested to identify the percentage of diesel replacement and an engine map designed to identify the optimum amount of hydrogen that can be introduced without impacting engine performance.

The installation includes lifting the tank assembly onto each of the two excavators and attaching it to the body of the machine. The hydrogen fuel management system control unit is then attached and connected to the engine management system The final part of the process is the installation of the Human Machine Interface (HMI) in the cab which display key system information to the operator.

Next tasks include emissions testing of the machines under controlled conditions in preparation for deployment to the construction sites towards the end of the year.

related articles

Element 1’s first project demonstration day is a success

Element 1’s first project demonstration day is a success

One of the excavators converted under the Element 1 project has been deployed for the first time at the BAM Victoria North project in Manchester. At a demonstration day held for all project partners and additional guests, visitors could see the machine successfully...

read more
Final Two Excavators Converted For Hydrogen Fuel

Final Two Excavators Converted For Hydrogen Fuel

Today marks another important step towards us deploying our end-to-end hydrogen fuel solution on construction sites. The project has successfully completed another important milestone with the installation of the hydrogen tanks and control systems to the two Kobelco...

read more